When Pipe Restoration Solutions tackles a pipe lining project, speed is of the utmost importance.
“We do a lot of work at hospitals and...
Relining/Rehab
Displaying results 52-68 of 223
Editorial
Case Studies - March 2022
Pipe hanger with locking system prevents pipe movement failure
Problem: A Chicago resident had an underground pipe failure with the downspout and waste pipe connecting...
Editorial
Product Focus - March 2022
BurstingPow-R Mole Trenchless Solutions PD-33MThe PD-33M pipe bursting machine from Pow-R Mole Trenchless Solutions is designed to replace existing underground pipes 2 to 6 inches in diameter....
Editorial
Profit-Producing Patches
The slogan for Linda Hudek’s company, LH Plumbing Services in Fairfield, Ohio, is, “Can do.” But for years, she was frustrated by...
Online Exclusives
Why Per Foot Pricing is a Bad Fit for Pipe Lining Jobs
“How much per foot should I charge for a lining or coating job? I have a restaurant that wants me to coat...
Online Exclusives
Small Cutter Speeds Up Reinstatement Time on Pipe Lining Jobs
Reinstating branch lines after installing liners in residential and commercial sewer laterals used to be a time-consuming job for Norman Hostetler, a trenchless...
Online Exclusives
A Timesaving Pipeline Coating System That Pays For Itself Quickly
Lining vertical runs of pipes inside buildings, particularly high-rise structures, is often problematic due to access issues with bulky pipe lining equipment. And then...
Online Exclusives
Doing a Cost Comparison Between Pipe Lining and Traditional Excavation
“Is lining pipe worth it? I hear all the sales guys tell me I need to line pipe, but I have a...
Online Exclusives
Curing Innovation Boosts Production for a Pipe Lining Venture
Lining one or two sewer laterals in a day would be considered great production by anyone’s standards in the trenchless pipe rehab...
Online Exclusives
Why Should You Offer Customers Pipe Rehabilitation?
“I bought a jetter several years ago and it’s the only tool I need to keep sewers flowing. I think that the...
Editorial
Case Studies - March 2021
CIPP lining restores cast iron pipe at naval base
Problem: When a U.S. Naval base in San Diego was remodeling their restrooms, the contractor found...
Editorial
Product Focus - March 2021
Bursting
Pow-R Mole Trenchless
Solutions PD-33MThe PD-33M pipe bursting machine from Pow-R Mole Trenchless Solutions is designed to replace existing underground pipes 2 to 6 inches in diameter....
Online Exclusives
Stacking Up Relining Jobs by Focusing on Vertical Installations
For years, Steve Allen was frustrated by his inability to effectively tackle what he believes is a large potential market for pipeline...
Online Exclusives
PipePatch Gives Plumber a Competitive Advantage
About four years ago, plumber and drain cleaner Chris Bontempo wanted to offer his customers a sewer line replacement method that was...
Online Exclusives
Plumbing Code’s Ban of CIPP in Cast Iron Pipe Reversed
NASSCO spent nearly two years advocating for the removal of language in the Uniform Plumbing Code (UPC) that banned the use of...
Editorial
Case Studies - March 2020
Piping choice speeds conversion of offices to apartments in historic building
Problem: A contractor sought to convert the Standard Building, a downtown Cleveland...
Editorial
Product Focus - March 2020
Bursting
Pow-R Mole Trenchless Solutions PD-33M
The PD-33M pipe bursting machine from Pow-R Mole Trenchless Solutions is designed to replace existing...