Mixing valves elevate water safety and efficiency at corrections facility

Problem: The Ohio Department of Rehabilitation and Corrections serves 5,200 inmates and 1,000 staff across 50 buildings. The facility was suffering from thermostatic mixing valves needing biweekly maintenance due to scaling and inconsistent mixing. That’s when mechanical contractor MG Energy undertook an energy and water conversion project.

Solution: To solve this, MG Energy installed 15 Caleffi LEGIOMIX 6000 Series digital mixing valves across all major building domestic hot water points of distribution. Featuring a self-cleaning ball valve design, the LEGIOMIX drastically reduced maintenance demands while maintaining precise mixed water temperature within plus or minus 3 degrees F. Crucially, the digital mixing valves provided an energy-efficient solution for Legionella risk mitigation. Utilizing a calendar-based automatic thermal disinfection program, the valves elevate recirculation loop temperatures only during nightly disinfection cycles to bring the circulate loop into a disinfection temperature range  without chemical additives.

Result: The upgrade delivered a low-maintenance, energy-efficient solution that guarantees safe, sanitary domestic hot water across facilities. “My whole company is 100% sold on the LEGIOMIX, it is a game-changer,” says David Metzger, P.E., C.E.M., president of MG Energy. 414-238-2366; www.caleffi.com


Heat pump water heater solves space, cost and efficiency challenges

Problem: The owner of a high-rise multifamily residential building in Battery Park, Manhattan, faced a pressing infrastructure decision: replace an aging, gas-fired domestic hot water system that could no longer deliver reliable, efficient service to residents. The upgrade needed to prioritize energy savings and meaningfully reduce the carbon footprint — a requirement driven by New York City’s Local Law 97, part of the 2019 Climate Mobilization Act. Space constraints within the building and rooftop mechanical room along with the difficulty of rigging large equipment into an existing building presented serious obstacles.

Solution: The idea of using the building’s general exhaust air for the heat pump’s air supply was the result of some creative thinking from John Stevens with Alternative Sustainability and Wallace Eannace. That air supply was ducted into the unused space in the penthouse mechanical room. Once the approach was established, finding the right piece of equipment was key. The Lochinvar Veritus was placed in a previously unused section of the mechanical room. A wall, ductwork and louvers were installed, and this section of the mechanical room was converted into a dedicated plenum room. Three nearby exhaust fans were ducted into this plenum room, positively pressurizing the space. When the Veritus unit operates, building exhaust air provides 100% of the air supply. Any excess air exits freely through an outside air louver, which always remains open. The unit’s discharge air is ducted to the exterior to prevent recirculation.

Result: Despite the particularly harsh winter conditions New York City experiences, the unit performs exceptionally well. During the last week of January 2026, with exterior temperatures reaching as low as 9 degrees F, the temperature inside the heat pump room remained at 65 degrees F — a testament to the effectiveness of the building energy recovery/plenum room design. 615-889-8900; www.lochinvar.com


Self-closing pipe clamps help plumber’s crews work faster

Problem: Mike Barth, owner of Barth Plumbing & Mechanical in northeast Ohio, frequently installs new piping systems for residential and commercial projects. His team traditionally relied on pipe talons for support installations, but the process often required installers to hold the pipe and support hardware simultaneously while keeping everything properly aligned. “We’re constantly running pipe on our projects,” says Barth. “Most of our work involves installing new piping systems, so anything that helps us work faster and more efficiently gets my attention.”

Solution: Barth began using Oatey Self-Closing Pipe Clamps to simplify pipe support installation. The clamps hold pipe securely in place, allowing installers to mount supports ahead of time and then roll the pipe into position. “I can set up a laser, mark everything out, and have someone mount all the clamps ahead of time,” Barth says. “Then I can simply roll the pipe into place. It eliminates a lot of the extra coordination that used to slow us down.” The clamps can be installed with standard screws and used across residential and commercial applications, including wood framing, metal framing and strut systems.

Result: Barth has now used the clamps on several projects and continues to incorporate them into ongoing installations. By reducing the need to manage the pipe and support simultaneously, the clamps have helped his crews simplify installation and work more efficiently. “You’re not trying to hold the pipe and the clamp at once to make sure everything stays straight,” Barth says. “It makes installations much easier and more efficient.” Because the same clamp system can be used across different framing conditions and applications, the crew reduces the number of separate support products they stock and carry to the job site, reducing excess material, simplifying inventory and avoiding unnecessary product waste. 800-321-9532; www.oatey.com


Hybrid electric water heater for couple looking for decarb solution

Problem: In the San Francisco Bay Area, California, a couple on a fixed income living in a spacious home with two full bathrooms was tired of paying high gas prices with their old, 1985 Rheem 40-gallon gas water heater.

Solution: Thomas Young of MotherFlushers recommended an Energy Star-certified Professional Prestige ProTerra Hybrid Electric Heat Pump with LeakGuard water heater from Rheem. Excited about heat pump technology, energy savings and performance, and already being an energy-focused household with electric power from a solar and battery backup system, the 50-gallon ProTerra was the best choice. Installation was easy with flexible water connections, front-accessible service components, earthquake straps and zero side-clearance requirements perfect for replacement. To make the switch even easier, Young helped the customer find local rebates, and with built-in Demand Response Ready EcoPort, the new owners are connected to utility programs for additional energy and time-of-use rate savings.

Result: Young reached out to the owners six months after the install to check in, and they are very pleased with the decision to go with a Rheem heat pump water heater. Quiet operation, capability to adjust operating modes remotely through built-in Wi-Fi powered by EcoNet and LeakGuard leak detection and automatic shut-off distinguish ProTerra as the solution for today’s high-performance homes. They have saved money and have enjoyed the cool air that comes from the unit in the summer months. 866-339-2388; www.rheem.com


Space-saving macerating system provides practical solution

Problem: When Marco Vivar and his family moved into their New Jersey home, they discovered that its one full bathroom and one half bathroom could not serve their growing household. Adding a toilet in the basement would ease the morning rush, but conventional below-floor plumbing would require extensive renovation and concrete work. That approach also risked generating construction debris and increasing the materials needed for the project.

Solution: After researching alternatives, Vivar selected the Sanicompact, a self-contained, dual-flush toilet with an integrated macerator and pump from Saniflo SFA. The system processes waste and moves it through a 1-inch discharge pipe, eliminating the need to break through the basement floor for conventional gravity drainage. Its dual-flush technology uses 1.28 gpf for solid waste and 1 gallon for liquids, supporting water conservation with every use. It can also accept graywater from a sink, although no fixture was connected in this installation. Vivar completed the project himself, using PVC pipe to connect the unit to the home’s existing drain system. With guidance from Saniflo’s technical support team and the installation manual, setup took only 15 to 30 minutes.

Result: The family gained a convenient basement toilet without major demolition, specialized tools or an extensive plumbing renovation. By preserving the concrete floor and using small-diameter piping, the project helped limit material use, construction waste and disruption. Its low water consumption also helps the family conserve water and reduce utility costs. Its compact footprint and quiet operation provide additional long-term value. 800-571-8191; www.saniflo.com


Prefabricated PEX water risers streamline resort construction

Problem: Control Air Enterprises was concerned about the resource impacts associated with installing chilled- and hot-water risers serving guest room coil fans at the Gaylord Pacific Resort and Convention Center in Chula Vista, California. They were looking for a solution that was lightweight and could reduce installation time, help minimize labor costs and material handling, and support a more efficient installation process.

Solution: Through the Uponor Prefabricated Services offering, Control Air Enterprises was able to utilize Uponor Prefabricated PEX Water Risers to minimize on-site work and material handling, reduce labor and cost savings, and decrease field connections up to 75%. This approach also helped reduce jobsite waste and installation-related impacts. The risers were assembled off site at the manufacturing facility and transported to the resort as ready-to-install assemblies. Installers could slide the assemblies into place, minimizing on-site work and material handling. Working with Control Air Enterprises, Uponor developed a support system requiring just two supports per floor. The simplified design helped further reduce installation work and material requirements while contributing to additional savings. According to Randy Ayers, division manager at Control Air Enterprises, crews needed to make only four field joints before moving to the next floor.

Result: By combining prefabrication and engineering expertise, Uponor helped create a more efficient construction process that helped minimize waste and on-site impacts as well as delivering tangible labor and cost savings, demonstrating how value-added services can support more sustainable construction. 800-321-4739; www.uponor.com 