In Mayfield, Kentucky, a 10-inch vitrified clay pipe was missing a 4-foot section, causing massive amounts of continuous inflow and infiltration. A small concrete bridge with an 18-inch storm drain crossing the sewer line sat above the pipe. Traditional dig-and-replace methods...
Case Study: Point Repair Saves Time and Money
Popular Stories
Discussion
Comments on this site are submitted by users and are not endorsed by nor do they reflect the views or opinions of COLE Publishing, Inc. Comments are moderated before being posted.