Loading...
Strong sewer odors permeating Franklin (Illinois) High School triggered complaints to Darrin Seymour, maintenance superintendent. He knew the problem stemmed from cracks in a 6-inch ductile iron main. The 205-foot-long pipe hung in a utility corridor beneath the main hallway, but most of the line was under 4 feet of backfill. Searching for rehabilitation options on the internet led Seymour to SLB Pipe Solutions in Bedford, Indiana.“The situation was bad,” says SLB Pipe Solutions co-owner Eric Spreen. “We pushed our RIDGID SeeSnake upstream through the 6-inch clean-out in the boiler room but couldn’t see much. The line was so occluded that forward
Please login or register to view Plumber articles. It's free, fast and easy!
Us Boiler Case Study
Next Article ›› Efficient and Green Plumbing Products

Related