The 199,000 Btuh Quik Heater from Quik-Lining Systems can be used to accelerate the curing of CIPP lateral sewer liners. The system includes a boiler that can raise the cure temperature to a safe and steady 180 degrees F. The system includes a recirculation pump, temperature controls, flow controls, a water circulation manifold, and the supply and return hoses. The unit runs on propane, can be used indoors or out, and is mounted to a hand truck that allows it to be carried into basements, attics, roofs, or virtually any site to cure a liner in an hour or less. It can cure a liner up to 8 inches and 150 feet in length. Units can be ganged for larger or longer lines. 605/695-6778; www.quiklining.com.













